Kitchen Remodel Quote Comparison: What to Check Before Hiring

Corvellis Editorial
Kitchen renovation plans and cabinet samples being reviewed

Two kitchen quotes are comparable only when they price the same kitchen. A lower total may reflect stock cabinets instead of custom units, a smaller countertop allowance, or owner-supplied appliances. Start by identifying these differences, not by negotiating a discount on an undefined scope.

Make a common specification sheet

Send each bidder the same layout, appliance list, finish selections, and list of retained items. Mark undecided products clearly. Ask contractors to distinguish fixed prices, allowances, optional work, and exclusions. “Kitchen renovation complete” is too vague to reveal who is supplying the backsplash or reconnecting the dishwasher.

Compare Ask each bidder to identify
Cabinet package Manufacturer or construction specification, number of units, hardware, fillers, panels, and installation.
Countertop Selected surface, measured scope, edge profile, cutouts, delivery, and installation.
Appliance work Supply versus installation, removal of old units, and connection work.
Finishes Backsplash area, wall repairs, paint, trim, and floor transitions.
Site logistics Protection of occupied rooms, debris removal, access arrangements, and cleanup.

Normalize the numbers without pretending to know missing prices

Hypothetical comparison: Bid A is $24,000 but excludes the backsplash and appliance installation. Bid B is $26,000 and includes both. If A supplies written add-on prices of $1,500 and $800, its comparable total becomes $26,300. The exercise does not establish which contractor is better; it shows that the $2,000 headline difference was misleading.

Do not insert a guessed allowance into an omitted line and treat it as a firm comparison. Mark it “unpriced” until the contractor responds. If an item is unnecessary, remove it from all bids before comparing again.

Separate product differences from installation differences

A different cabinet package might explain part of a price gap. A different approach to protecting your home, managing subcontractors, or repairing walls might explain another part. Ask for alternatives that preserve the same scope: for example, a specific second countertop option rather than “use something cheaper.” Record the exact replacement specification.

Discuss warranty responsibility where products are owner-supplied. Who handles a faulty appliance discovered after installation? Who pays for removal and reinstallation? A manufacturer's product warranty and a contractor's promise about workmanship are different documents.

Ask about schedule commitments

Request the anticipated sequence: final measurements, ordering, demolition, cabinet installation, countertop measurement and installation, connections, and completion. Ask which dates depend on supplier delivery. Clarify whether a delayed owner purchase changes the schedule or creates an additional visit charge.

Use a decision record

For each bid, write down the comparable total, remaining unknowns, evidence of relevant experience, and your reason for choosing it. The FTC cautions against automatically choosing the lowest bidder. A decision record keeps an attractive discount from overshadowing unanswered questions.